General Terms and Conditions

PEGA Logistics GmbH

We operate exclusively in accordance with the Allgemeine Deutsche Spediteurbedingungen 2017 – ADSp 2017 – (German Freight Forwarders' General Terms and Conditions 2017). Note: In clause 23 the ADSp 2017 deviates from the statutory liability limitation in section 431 German Commercial Code (HGB) by limiting the liability for multimodal transportation with the involvement of sea carriage and an unknown damage location to 2 SDR/kg and, for the rest, the customary liability limi-tation of 8,33 SDR/kg additionally to Euro 1,25 million per damage claim and EUR 2,5 million per damage event, but not less than 2 SDR/kg.

 

 

German Freight Forwarders' Standard Terms and Conditions - ADSp 2017

 

(The following text is a translation from the German language original. In case of disputes the German language original of the ADSp are applicable)

 

 

Preface

The German Freight Forwarders’ Standard Terms and Conditions 2017 (Allgemeine Deutsche  Spediteurbedingungen 2017 – ADSp 2017) are recommended for use as of 1 January 2017 by the Federal Association of German Industry (BDI), the Federal Association of German Wholesale, Foreign Trade and Services (BGA), the Federal Association of Road Haulage, Logistics and Disposal (BGL), the Federal Association of Furniture Forwarders and Logistics (AMÖ), the Federal Association of Transport and Logistics in Industry and Trade (BWVL), the Association of the German Chambers of Industry and Commerce (DIHK), the Federal Association of German Freight Forwarders and Logistics Operators (DSLV) and the German Retail Federation (HDE). This advice is non-binding and the contract parties are free to make agreements that deviate from the contents of this recommendation.

 

1. Definitions

 

1.1 Delivery

The term of Delivery includes also the delivery in the warehouse business.

 

1.2 Principal

Legal person which concludes a Freight Forwarding Contract with the Freight Forwarder.

 

1.3 Theft-Sensitive Goods

Theft-Sensitive Goods are those exposed to an increased risk of robbery and theft, such as money, precious metals, jewellery, watches, precious minerals, art, antiques, check books, credit cards and/or other payment means, stocks and security papers, documents, spirits, tobacco, entertainment electronic goods, telecommunications goods, IT equipment and accessories as well as smart cards.

 

1.4 Consignee

Legal person to whom the goods shall be delivered according to the Freight Forwarding Contract or valid instruction of the Principal or other persons authorised to dispose of.

 

1.5 Vehicle

Means of transport for the transportation of goods on traffic routes.

 

1.6 Dangerous Goods

Dangerous Goods are goods that have the potential to endanger people, Vehicles or legal interests of third parties during the course of standard transportation, warehousing or other activities. In particular, hazardous goods are defined as goods that fall in the scope of application of statutes and regulations relating to hazardous goods, such as provisions covering dangerous materials, water or garbage.

 

1.7 Loading Means

Means for the aggregation of Packages and for the creation of loading units, such as pallets, container, swap trailers, bins.

 

1.8 Place of Loading / Discharge

The postal address, if the parties have not agreed on a more precise location.

 

1.9 Time of Performance

The time (date, time of day) up to a particular performance must be taken place, for example a Time Frame or Point of Time.

 

1.10 Packages

Single items or units formed by the Principal for the fulfilment of the order with or without Loading Means, which the Freight Forwarder must handle as one ensemble (freight item as defined by sections 409, 431, 504 German Commercial Code (HGB).

 

1.11 Damage Case / Damage Event

Damage Case means, when, due to an external process, a claimant raises a claim on the basis of a Freight Forwarding Contract or in lieu of a freight forwarding claim; Damage Event means, when, due to an external process, several claimants raise claims on the basis of several Freight Forwarding Contracts.

 

1.12 Interfaces

After acceptance and before Delivery of the goods by the Freight Forwarder, Interfaces are defined as any transition of the goods from one legal person to another any transhipment from one Vehicle to another, any (temporary) storage.

 

1.13 Freight Forwarder

Legal person, which concludes a Freight Forwarding Contract with the Principal. Freight Forwarders are particularly carrier according to section 407, Freight Forwarder according to section 453, warehouse keeper according to section 467 and sea freight carrier according to sections 481, 527 HGB.

 

1.14 Freight Forwarding Contracts (“Verkehrsverträge”)

The ADSp cover all Freight Forwarding Contracts undertaken by the Freight Forwarder as contractor for all activities, regardless of whether they are freight forwarding, carriage of goods (by sea), warehousing or other, typical services pertaining to the freight forwarding business, such as customs handling, tracking of goods or cargo handling. These terms and conditions also apply to all typical logistical services included in freight forwarding, if these are in relation to the transport or warehousing of goods, in particular to activities such as the creation of loading units, consignments, labelling, weighing of goods and returns processing. Contracts about the presentation of manned motor Vehicles for use on instruction by the Principal shall also be deemed as Freight Forwarding Contracts (“Lohnfuhrverträge”).

 

1.15 Shipper

Legal Person, which hands over the goods for transportation according to the Freight Forwarding Contract or on a valid instruction.

 

1.16 Material Contractual Obligations

Material Contractual Obligations are defined as those that initially enable the contractually agreed fulfilment of the Freight Forwarding Contract and on which the contracting partner is entitled to reasonably rely on.

 

1.17 Valuable Goods

Good, at the time and place of taking over, with an actual value of at least 100 Euro/kg.

 

1.18 Time Frame

Agreed Time Frame for the arrival of the Freight Forwarder at the Place of Loading or Place of Discharge.

 

1.19 Point of Time

Agreed Point of Time for the arrival of the Freight Forwarder at the Place of Loading or Place of Discharge.

 

 

2. Scope of application

 

2.1  

The ADSp cover all Freight Forwarding Contracts undertaken by the Freight Forwarder as contractor.

 

2.2

Statutory provisions which cannot be modified by pre-formulated standard terms and conditions take precedence over the ADSp.

 

2.3

The ADSp do not apply to businesses that are exclusively dedicated to:

 

2.3.1

packaging,

 

2.3.2

transportation and warehousing of towed or salvaged goods,

 

2.3.3

transportation and warehousing of removal goods according to section 451 HGB,

 

2.3.4

storage and digitalisation of files; files are all types of embodied and digitalized business papers, documents, data storage mediums and similar objects for information collection,

 

2.3.5

abnormal and heavy-load transports, which require a transportation regulation permission or exception, crane services and associated assembly work,

 

2.4

The ADSp do not apply to Freight Forwarding Contracts with consumers as defined in Section 13 German Civil Code (BGB).

 

 

3. Obligation of the Principal regarding placing of orders, information requirements, special goods

 

3.1

The Principal shall inform the Freight Forwarder about all relevant parameters affecting the carrying out of the order. These include

3.1.1

addresses, type and quality of the goods, the gross weight (including packaging and Loading Means) or otherwise specified quantities, marks, numbering, quantities and type of Packages, specific characteristics of the goods (such as live animals and plants, perishability), the value of the goods (for example for customs purposes or the insurance of goods according to clause 21 ADSp) and Delivery times,

 

3.1.2

all public-legal duties and safety regulations, such as duties relating to customs, foreign trade regulations (particularly those relating to goods and people as well as specific country embargos) and legal safety obligations.

 

3.1.3

in case of carriage of goods by sea, all relevant data in the compulsory form relating to safety statutes (e. g. International Convention for the Safety of Life at Sea (SOLAS).

 

3.1.4

intellectual property rights of third parties, such as trademark and license limitations which are connected to the possession of the goods, including legal or regulatory hindrances capable of prejudicing the processing of the order.

 

3.1.5

specific technical requirements for the means of transport and particular cargo securing means to be supplied by the Freight Forwarder.

 

3.2

In case of Dangerous Goods, the Principal must inform the Freight Forwarder in due time and in text form about the quantity and specific nature of the hazard including - if required - the necessary safety measures. If Dangerous Goods fall into scope of the law on the transport of dangerous goods (Gesetz über die Beförderung gefährlicher Güter (GGBefG) or if other transported and stored goods fall into scope of other Dangerous Goods or garbage related statutes or regulations, the Principal must provide the relevant information, in particular the classification according to the relevant Dangerous Goods laws, and, at the latest, during the handover of the goods, supply the required documentation.

 

3.3

In case of valuable or Theft-Sensitive Goods, the Principal must inform the Freight Forwarder in text form regarding the type and value of the goods and the current risks involved to enable the Freight Forwarder to assess the acceptance of the order or take appropriate measures for the safe and damage-free completion of said order. In case of acceptance of the order, the Freight Forwarder is obliged to undertake appropriate safety measures for protecting the goods.

 

3.4

The Principal is responsible for supplying the Freight Forwarder with all information, certificates and other documentation required, such as customs classification, for the correct processing of customs or other statutorily required handling of the goods, including, but not limited to, security checks for air freight shipments.

 

 

4. Rights and duties of the Freight Forwarder

 

4.1

The Freight Forwarder shall act in the interest of the Principal, check the placed order for obvious faults and immediately inform the Principal, if required, about all dangers known by the Freight Forwarder for the fulfilment of the order.

 

4.2

The Freight Forwarder takes care that the Vehicles, loading safety means and, if their presentation is agreed, Loading Means are in a technically perfect condition, comply with statutory provisions and the requirements of the Freight Forwarding Contract. Vehicles and Loading Means shall be equipped with the typical appliances, equipment or methods for the protection of the goods, in particular loading safety means. Vehicles shall have low emissions and noise as well as low energy consumption.

 

4.3

The Freight Forwarder shall deploy reliable, appropriate and, for the particular task in question, suitable and duly employed, qualified and trained drivers and, if required, with a driver certification.

 

4.4

On foreign premises, the Freight Forwarder shallt comply with the house rules, plant or construction site regulations in force, if they were announced to the Freight Forwarder. Section 419 HGB remains unaffected.

 

4.5

The Freight Forwarder is entitled to make customs clearance dependent on issuance of a written power of attorney that assigns direct representation.

 

4.6

If the Freight Forwarder is assigned with the cross-border transportation of the goods or the import or export customs clearance, the Freight Forwarder is, in case of doubt, also entitled to act in regards to the customs or other statutorily required handling of the goods, if the transport of the goods to the agreed destination would be impossible without such action.

 

The Freight Forwarder is hereby entitled

4.6.1

to open Packages whenever such action is necessary to comply with statutorily required controls (for example, Freight Forwarder as regulated agent), and, subsequently, to undertake all measures necessary to complete the order, such as repackaging the goods.

 

4.6.2

to advance payments required by customs.

 

4.7

In case of damage to or delay of the goods and upon request by the Principal or Consignee, the Freight Forwarder must procure immediately all required and known information for securing their compensation claims.

 

4.8

In the absence of a separate agreement in the order supplied to the Freight Forwarder, the service does not include:

 

4.8.1

the supply or replacement of pallets or other Loading Means,

 

4.8.2

the loading and unloading of goods, unless otherwise indicated by circumstances or common practice.

 

4.8.3

a transhipment ban (Section 486 HGB does not apply),

 

4.8.4

the allocation of a shipment tracking system, unless it is in line for this sector of industry. Clause 14 ADSp remains unaffected.

 

4.8.5

returns, detours and hidden additional cargo. If in deviation to the actual order, one or more Packages are handed over and accepted for transportation by the Freight Forwarder, then the Freight Forwarder and the Principal concludes a new Freight Forwarding Contract about these goods. In case of returns or hidden additional cargo and in absence of a separate agreement, the terms and conditions of the original Freight Forwarding Contract will apply. Clause 5.2 ADSp remains unaffected.

 

4.9

Further service and information obligations, for example quality management measures and their auditing, monitoring and evaluation systems as well as key performance indicators needs to be expressly agreed.

 

 

5. Contact person, electronic communication and documents

 

5.1

Upon request of a contracting party, each side will nominate one or more contact persons to receive information, explanations and enquiries regarding the fulfilment of the contract and exchange names and addresses. This information needs to be updated in case of changes. If either contracting party fails to provide details for a contact person, then the relevant signatory to the contract shall be the designated contact person.

Information obligations, which exceeds the obligation in statutory provisions, for example measures of the Freight Forwarder in case of disruptions, in particular, an imminent delay during takeover or Delivery, obstacles to carriage and Delivery, damages to the goods or other disruptions (emergency concept) needs to be agreed separately.

 

5.2

In the absence of an expressly agreement, contractual statements by warehousing or transport personnel require approval from the respective party to be considered valid.

 

5.3

The Principal takes care of the required declarations to be supplied by the Principal’s Shipper or Consignee during the fulfilment of the contract at the Place of Loading and Place of Delivery, and of real actions, such as Delivery and receipt of the goods.

 

5.4

If agreed between the Principal and the Freight Forwarder, the parties will transmit and receive the shipping details, including the creation of the invoice, by electronic means (electronic data interchange / remote transmission). The  transmitting party carries the responsibility for the loss, completeness and validity of any sent data.

 

5.5

In case of an agreement according to clause 5.4 ADSp, the parties ensure that their IT system is ready for operation and that data can be processed appropriately, including the usual safety and control measures, to protect the electronic data exchange and prevent unauthorized access, modification, loss or destruction by third parties. All parties are obliged to give timely notification of any changes to their IT systems that could affect the electronic data interchange.

 

5.6

Electronic or digital documents, in particular proof of deliveries, shall be considered equal to written documents.Furthermore, each party is entitled to archive written documentation in exclusively electronic or digital format and to eliminate originals, the latter always in consideration of the legal regulations regarding the same.

 

 

6. Packaging and labelling duties of the Principal

 

6.1

The Principal shall pack the goods, and if required, clearly and permanently label all Packages with their required identifications, such as addresses, marks, numbers and symbols relating to the handling and characteristics of the goods. Old identification marks must be removed or garbled. The same applies for Packages.

 

6.2

Furthermore, the Principal is responsible for:

6.2.1

identifying all items belonging to the same shipment, to

ensure easy recognition,

6.2.2

ensuring that Packages, if required, cannot be accessed without leaving external traces.

 

 

7. Securing cargo and supervisory duties of the Freight Forwarder

 

7.1

In all cases where loading and discharge occurs at more than one location, the Freight Forwarder takes care for the security of cargo until the last Place of Discharge and at all times, but not before the completion of loading in a transport safety manner.

 

7.2

The Freight Forwarder shall conduct controls at all Interfaces. The Freight Forwarder shall check completeness and identity of the goods, their apparent good order and condition as well as all seals and locks and record any irregularities in the accompanying documents or via separate notification.

 

 

8. Receipt

 

8.1

The Freight Forwarder shall issue a certificate of receipt with reservations noted, if necessary.In case of doubt, the certificate of receipt issued by the Freight Forwarder only confirms the number and type of Packages, but not their content, value, weight or other measurements.

 

8.2

Previously loaded or sealed loading units, such as containers or swap bodies and previously transmitted data, the accuracy of the certificate of receipt regarding quantity and type of loaded Packages is vitiated, if the Freight Forwarder notifies the Principal on differences (in quantity) or damages, immediately after unloading the loading unit.

 

8.3

The Freight Forwarder must request proof of Delivery from the Consignee in form of a Delivery receipt listing all Packages as outlined in the order or other accompanying documentation. Should the Consignee refuse to issue a Delivery receipt, the Freight Forwarder must request instructions from the Principal. The Principal can demand the Delivery receipt for a period of one year after the goods have been delivered.

 

8.4

As receipt for takeover or Delivery of the goods counts any signed document which gives evidence for fulfilment of the order, such as Delivery notes, forwarders certificate of receipt, consignment note, sea way bill, consignment bill or a bill of

lading.

 

8.5

The certificate of receipt and Delivery receipt can also be issued electronically or digitally, unless the Principal requests the issuing of a consignment note, sea way bill, consignment bill or bill of lading.

 

 

9. Instructions

 

Upon conclusion of the contract, the Freight Forwarder must follow all instructions regarding the cargo, unless carrying out such instructions poses disadvantages to his business or damages to consignments of other Principals or Consignees. If the Freight Forwarder intents not to follow an instruction, then the Freight Forwarder shall inform the instructor immediately.

 

 

10. Freight payment, cash on Delivery

 

10.1

Notifications by the Principal to the effect that the order should be executed freight collect or for the account of the Consignee or a third party, for example according to Incoterms, do not exempt the Principal from his obligation to pay the Freight Forwarder its remuneration and outlays, including freights, customs charges and other expenses. Freight collect instructions, for example according to section 422 HGB, Article 21 CMR, remain unaffected.

 

 

11. Default of loading and Delivery times, demurrage

 

11.1

In cases where the Principal must load or unload the Vehicle, the Principal has the obligation to do so within the agreed, otherwise within a reasonable loading and unloading time.

 

11.2

If, in case of carriage of goods by road, the parties agree on a Time Frame or Point of Time or is such notified by the Freight Forwarder without objection by the Principal, Shipper or Consignee, the loading and unloading time - irrespective of the number of shipments per Place of Loading and Discharge - for full truck loads, but with the exception for bulk goods, for Vehicles with 40 tons maximum permissible weight shall be maximum 2 hours for loading and unloading in general. The times shall be reduced appropriately for Vehicles with a lower maximum permissible weight in the individual case.

 

11.3

The loading or unloading time begins with the arrival of the road vehicle at the designated Place of Loading and Discharge (for example, by notifying the gate keeper), and ends when the Principal has completed all its duties. However, if a Time of Performance has been agreed for the arrival of road Vehicles at the Place of Loading and Discharge, the loading and unloading time does not begin before the agreed presentation time.

 

11.4

In cases where the contractually agreed loading and unloading time are not maintained due to reasons beyond the Freight Forwarder’s scope of responsibility, the Principal must pay the Freight Forwarder the agreed, otherwise commonly accepted, demurrage fees.

 

11.5

The aforementioned provisions apply accordingly, when the Freight Forwarder is obliged to load and unload the goods, and when the Principal is exclusively committed to prepare the goods for loading or to accept them after unloading.

 

 

12. Performance hindrances and force majeure

 

12.1

If the Freight Forwarder is unable to take over the goods, or unable to take them over on time, the Freight Forwarder must immediately notify and seek instruction from the Principal. Section 419 HGB applies accordingly. The Principal remains entitled to terminate the Freight Forwarding Contract, whereas the Freight Forwarder is not entitled to ask for compensation according to section 415 (2) HGB.

 

12.2

Performance hindrances that do not fall within the scope of responsibility of either contracting party, free said parties of their performance duties for the duration of the hindrance and the extent of its impact. Such performance hindrances are defined as force majeure, civil unrest, war or acts of terrorism, strikes and lock-outs, transport route blockades, and any other unforeseeable, unavoidable and serious events. In case of a performance hindrance, the contracting parties are obliged to notify the other party immediately. Additionally, the Freight Forwarder is obliged to ask the Principal for instructions.

 

 

13. Delivery

 

13.1

If, after arrival at the Place of Discharge, it becomes apparent that the unloading cannot take place within the time of unloading, the Freight Forwarder must immediately notify the Principal and request for relevant instructions. Section 419 HGB applies accordingly.

 

13.2

If the Freight Forwarder cannot adhere to the agreed Time of Performance or - in the absence of an agreement - to a reasonable time for Delivery, the Freight Forwarder shall request instructions from the Principal or the Consignee.

 

13.3

In cases where the Consignee is absent at the designated home, business or shared location address and if the Consignee lives therein, the goods, always assuming there are no obvious doubts regarding the entitlement to receive the goods of the person in question, may be delivered to:

 

13.3.1

an adult family member; a family employee; or an adult with permanent residence at the designated home address,

13.3.2

an employee at the designated business location,

13.3.3

a manager or representative authorised to receive the goods at the designated shared location.

 

13.4

In cases where the Freight Forwarder and Principal have agreed on Delivery without the presentation to an actual person (for example, night, garage or assembly line deliveries), Delivery is deemed to have taken place on the actual physical deposit of the goods at the agreed location.

 

13.5

The Delivery can only take place under supervision of the Principal, Consignee or a third party authorised for reception. Clauses 13.3 and 13.4 ADSp remain unaffected.

 

 

14. Information and restitution duties of the Freight Forwarder

 

14.1

The Freight Forwarder has the duty to supply the Principal with the required information and, upon request, with the status of the business as well as to demand accountability upon completion. However, the Freight Forwarder is only obliged to reveal costs, if the Freight Forwarder works on Principal’s account.

 

14.2

The Freight Forwarder has the duty to give anything to the Principal what he has received by carrying out and managing the business.

 

 

15. Warehousing

 

15.1

The Principal has the duty to pack and mark the goods, if required, and to make available all documents and information to the Freight Forwarder for an appropriate storage.

 

15.2

The Freight Forwarder decides in its sole discretion if warehousing takes place in its own facilities or, if not otherwise agreed, those of third parties. Whenever warehousing take place at third party warehouses, the Freight Forwarder must supply timely information regarding its name and location to the Principal or, whenever a warehouse warrant has been issued, to make a note of the information on the same.

 

15.3

The Freight Forwarder takes care for the duly maintenance and care of the warehouse and storage space, the drives on the premises and for securing the goods, in particular theft protection. Additional security measures, for example measures exceeding the statutory fire protection laws, must be explicitly agreed.

 

15.4

Unless otherwise agreed:

 

15.4.1

takeover of the goods for warehousing begins with the

unloading of the goods from the Vehicle by the Freight Forwarder and ends with the completion of the Delivery by the Freight Forwarder.

 

15.4.2

inventory management is via the Freight Forwarder’s inventory accounting,

 

15.4.3

there is one physical inventory inspection per year. On instruction of the Principal, the Freight Forwarder shall conduct further physical inventories against compensation.

 

15.5

With taking over the goods and if appropriate examination means are available, the Freight Forwarder is obliged to conduct a receiving inspection on types, quantities, marks, numbering, quantities of Packages as well as outer visible damages according to section 438 HGB.

 

15.6

The Freight Forwarder shall conduct regular inspections with appropriate personnel for securing the goods.

 

15.7

In case of stock shortfall and imminent changes at the goods, the Freight Forwarder shall immediately inform the Principal and ask for instructions. Section 471 (2) HGB remains unaffected.

 

15.8

Additional service and information obligations require an explicit agreement.

 

 

16. Remuneration

 

16.1

The services according to the Freight Forwarding Contract are compensated with the agreed remuneration, if this remuneration includes the costs for transportation and warehousing. Supplemental claims for costs occurred during regular transportation or warehousing and which were not foreseeable at the time of the offer, cannot be claimed separately, unless otherwise agreed. Calculation errors are at the expense of

the calculator. sections 412, 418, 419, 491, 492, 588 until 595 HGB and comparable provisions of international conventions remain unaffected.

 

 

17. Compensation claims and right of recourse

 

17.1

The Freight Forwarder is, if not caused by him, entitled to ask for refund of expenses properly incurred, in particular those relating to average contributions, detention or demurrage charges, including additional packaging for protecting the goods.

 

17.2

If the Principal instructs the Freight Forwarder to receive goods and if, on reception of the goods by the Freight Forwarder, freight, cash on delivery, customs duties, taxes, or other expenses and charges are demanded, the Freight Forwarder is entitled - but not obliged - to pay these costs according to the circumstances he has properly assessed, and to claim reimbursement from the Principal, unless otherwise agreed.

 

17.3

On request, the Principal must immediately indemnify the Freight Forwarder for expenditures, such as freight, average contributions, customs duties, taxes and other fees demanded from the Freight Forwarder, in particular acting as a person authorised to dispose or as possessor of goods belonging to third parties, unless the Freight Forwarder is not responsible for their accrual.

 

18. Invoices, foreign currencies

 

18.1

Remuneration claims of the Freight Forwarder require the reception of an invoice or payment schedule in accordance to statutory requirements. If not otherwise agreed, the maturity is not dependent on presenting a delivery receipt in case of an uncontested Delivery.

 

18.2

Regarding foreign Principals or Consignees, the Freight Forwarder is entitled to ask whether to receive payment in the relevant foreign currency or in Euro (EUR).

 

18.3

If the Freight Forwarder owes foreign currency or has advanced foreign currency amounts, the Freight Forwarder is entitled to ask for payment in either the relevant foreign currency or in EUR (EUR). In case of Euro (EUR), currency conversion is made according to the official exchange rate on the day of payment, which shall be evidenced by the Freight Forwarder.

 

18.4

Payment according to a credit memo procedure must be expressly agreed. In case of doubt, all credit memos are to be issued immediately, upon completion of services. Clause 18.1 1st sentence ADSp is not applicable for credit memo procedures.

 

 

19. Set-off, Retention

 

In the face of claims arising from the freight forwarding contract and associated non-contractual claims, set-off or retention is only permitted when the claim is uncontested, ready for decision or legally established.

 

 

20. Lien and retention rights

 

20.1

The Freight Forwarder is entitled to secure its demands arising from freight forwarding services according to the legally permitted regulations regarding lien and retention rights.

 

20.2

Lien rights can be exercised according to the legally established provisions, providing:

 

20.2.1

the threat and the required notifications about the lien exercise and the sale of the pledged items by the carrier shall be forwarded to the Consignee,

 

20.2.2

the time limit of one month as specified in section 1234 BGB is superseded by a time limit of two weeks.

 

20.3

The Principal is entitled to prohibit the exercise of the lien by granting an equivalent security for its claims, such as a directly enforceable bank guarantee.

 

 

21. Insurance of goods

 

21.1

The Freight Forwarder arranges the insurance of the goods (c. f. goods in transit or warehousing insurance) with an insurer of its choice, when the Principal assigns the Freight Forwarder to do so prior to handing over the goods.

 

21.2

The Freight Forwarder shall arrange insurance for the goods, if this is in the interests of the Principal. The Freight Forwarder can assume that insurance is in the interests of the Principal, in particular when:

 

21.2.1

the Freight Forwarder has arranged insurance for a previous Freight Forwarding Contract for the same Principal in the course of an ongoing business relationship,

 

21.2.2

the Principal has declared a value of the goods for the purpose of insurance.

 

21.3

The assumption that insurance is in the interest of the Principal according to clause 21.2 ADSp can be discounted, in particular when:

 

21.3.1

the Principal has prohibited the purchase,

 

21.3.2

the Principal is a Freight Forwarder, carrier or warehouse keeper.

 

21.4

In case of purchasing insurance cover, the Freight Forwarder shall observe instructions of the Principal, in particular the amount insured and risks to be covered. In the absence of such an instruction, the Freight Forwarder must assess the type and scope of insurance in its sole discretion and purchase insurance cover at the usual market conditions.

 

21.5

If, due to the nature of the goods to be insured, or for another reason, the Freight Forwarder is unable to purchase insurance cover, the Freight Forwarder will notify the Principal immediately.

 

21.6

If the Freight Forwarder purchases an insurance after conclusion of the Freight Forwarding Contract and upon instruction of the Principal or recovers a claim or acts otherwise on behalf of the Principal regarding carrying out insurance claims or averages, the Freight Forwarder is entitled to a reasonable remuneration according to local standards, otherwise, an appropriate remuneration, in addition to the compensation of its expenses, even in the absence of a prior agreement.

 

 

22. Liability of the Freight Forwarder, Subrogation of claims of reimbursement

 

22.1

The Freight Forwarder is liable for damages according to the statutory provisions. However, the following provisions shall apply, in as much as they do not contradict mandatory regulations, in particular the law of pre-formulated terms and conditions.

 

22.2

In all cases, where the Freight Forwarder is fault-based liable for losses or damages to the goods (“Güterschaden”) according to clause 23.3 and 24, the Freight Forwarder must only pay the value and reimburse the costs according to sections

429, 430, 432 HGB instead of damage compensation.

 

22.3

In case of inventory divergences, the Freight Forwarder is entitled to balance the inventory with positive stock balance differences and stock shortfall of the same Principal for value evaluation in cases as set out in clause 24 ADSp.

 

22.4

If the Freight Forwarder has claims, for which the Freight Forwarder is not liable for, against a third party in case of damages, or in cases when the Freight Forwarder has claims exceeding the sum for which the Freight Forwarder is liable, the Freight Forwarder must subrogate such claims to the Principal upon request, unless the Freight Forwarder has a separate agreement to pursue claims on behalf and at the expense of the Principal. sections 437, 509 HGB remain unaffected.

 

 

23. Liability limitations

 

23.1

Except in case of damages during carriage of goods by sea or ordered warehousing, the Freight Forwarder’s liability for damages to goods is limited according to Section 431 (1), (2) and (4) HGB, to:

 

23.1.1

8,33 Special Drawing Rights (SDR) for every kg, whenever the Freight Forwarder is:

- a carrier, as defined by Section 407 HGB,

- acting as principal (“Spediteur im Selbsteintritt”), fixed costs freight forwarder (Fixkostenspediteur) or consolidator (“Sammelladungsspediteur”), according to sections 458 to 460 HGB or

- care, custody and control Freight Forwarder (“Obhutsspediteur”) according to Section 461 (1) HGB.

 

23.1.2

2 instead of 8.33 SDR for every kg, whenever the Principal has agreed to a Freight Forwarding Contract which is subject to a variety of transport means and includes carriage of goods by sea and an unknown damage place. In case of a known damage place, the liability according to section 452a HGB is subject to the liability exclusion and liability limitation of the ADSp.

 

23.1.3

Whenever Freight Forwarder’s liability according to clause 23.1.1 ADSp exceeds an amount of EUR 1,25 million per Damage Case, this liability is furthermore limited to EUR 1,25 million per Damage Case, or to 2 SDR for every kg, whichever amount is higher.

23.2

The liability of the Freight Forwarder for damages to the goods in its custody for Freight Forwarding Contracts which are subject to carriage of goods by sea and cross-border transportation is limited to the maximum statutory liability amount. Clause 25 ADSp remains unaffected.

 

23.3

For all cases out of scope of clauses 23.1 and 23.2, such as section 461 (2) HGB, 280 ff BGB, the liability of the Freight Forwarder for damages to goods is limited according to Section 431 (1), (2) und (4) HGB to a maximum of:

 

23.3.1

2 SDR per kg for Freight Forwarding Contracts relating to carriage of goods by sea or a transportation by a variety of transport means, but including carriage of goods by sea,

 

23.3.2

8.33 SDR per kg for all other Freight Forwarding Contracts.

 

23.3.3

Furthermore, the Freight Forwarder’s liability is limited to the maximum amount of EUR 1,25 million for each case of damage.

 

23.4

The liability of the Freight Forwarder for all other damages than damages to the goods with the exception of damages during ordered warehousing or damages to personal injury or goods of third parties is limited to three times the amount that would be payable for the loss of goods according to clauses 23.3.1 or 23.3.2 ADSp. Furthermore, the Freight Forwarder’s liability is limited for each case of damage to the maximum amount of 125,000 Euros.

 

23.4.1

Sections 413 (2), 418 (6), 422 (3), 431 (3), 433, 445 (3), 446 (2), 487 (2), 491 (5), 520 (2), 521 (4), 523 HGB as well as any relevant liability provisions in international conventions shall remain unaffected.

 

23.4.2

Clause 23.4 ADSp is not applicable on statutory provisions, such as Article 25 Montreal Convention (MC), Article 5 Règles uniformes concernant le Contrat de transport international ferroviaire des marchandises (CIM) or Article 20 Convention de Budapest relative au contract de transport de marchandises en navigation intérieure (CMNI), which extend Freight Forwarder’s liability or permit to extend.

 

23.5

If Freight Forwarder’s liability according to Articles 23.1, 23.3 and 23.4 ADSp exceeds the amount of EUR 2,5 million per Damage Event, then Freight Forwarder’s liability is, irrespective of how many claims arise from a single Damage Event, further limited to a maximum amount of EUR 2,5 million per Damage Event or to 2 SDR per kg for lost or damaged goods, whichever amount is the higher. When there is more than one claimant, the Freight Forwarder’s liability shall be proportionate to individual claims.

 

 

24. Liability limitations for ordered warehousing, inventories and declaration of value

 

24.1

In the case of ordered warehousing, the liability of the Freight Forwarder for damages to goods is limited to:

 

24.1.1

8.33 SDR for every kg corresponding to 431 (1), (2) and (4) HGB,

 

24.1.2

a maximum of EUR 35,000 per Damage Case.

 

24.1.3

70,000 Euros per year, in cases where the damage claimed by the Principal bases, contrary to clause 24.1.2 ADSp, on a difference between calculated stock and actual stock of the inventory, irrespective of the amount and type of inventory taking and the amount of Damage Cases causing the difference in inventory.

 

24.2

Upon payment of an agreed supplement and prior to warehousing of goods, the Principal can specify a value in text form for an increased liability that differs from the maximum amounts stipulated in clause 24.1. In this case, the specified value replaces the relevant maximum amount.

 

24.3

In case of warehousing upon instruction, the Freight Forwarder’s liability for other damages, excluding damages to personal injury or goods of third parties, is limited to EUR 35,000 per case of damage.

 

24.4

In case of warehousing upon instruction, but excluding personal injury or damages to goods of third parties, the Freight Forwarder’s liability is always limited to EUR 2,5 million per Damage Event, irrespective of how many claims arise from a single Damage Event. When there is more than one claimant, the Freight Forwarder’s liability shall be proportionate to individual claims. Clause 24.2 ADSp remains unaffected.

 

25. Exclusion of liability for carriage of goods by sea and inland waterway transportation

 

25.1

In accordance with section 512 (2) No. 1 HGB, it is agreed that:

The Freight Forwarder in its position as carrier is not responsible for any fault or neglect on the part of its servants or of the ship’s company, insofar as the corresponding damage was caused in the course of steering or otherwise operating the ship, or was caused by fire or explosion on board the ship and the measures taken were not predominantly for the benefit of the cargo.

 

25.2

According to Article 25 (2) CMNI it is agreed that the Freight Forwarder in its position as carrier or actual carrier is not liable for damages:

 

25.2.1

caused by an act or omission by the master of the vessel, the pilot or any other person in the service of the vessel, pusher or tower during navigation or in the formation or dissolution of a pushed or towed convoy, provided that the Freight Forwarder complied with the obligations set out for the crew in Article 3 (3) CMNI, unless the act or omission results from an intention to cause damage or from reckless conduct with the knowledge that such damage would probably result,

 

25.2.2

caused by fire or an explosion on board the vessel, where it is not possible to prove that the fire or explosion resulted from a fault of the Freight Forwarder or the actual carrier or their servants or agents or a defect of the vessel,

 

25.2.3

the defects existing prior to the voyage of his vessel or of a rented or chartered vessel if he can prove that such defects could not have been detected prior to the start of the voyage despite due diligence.

 

25.3

Clause 22.4 ADSp remains unaffected.

 

 

26. Non-contractual liability

In accordance with sections 434, 436 HGB, the above mentioned liability exclusions and limitations also apply to non-contractual claims. Clause 23.4.1 ADSp applies

accordingly.

 

 

27. Qualified fault

 

27.1

Liability exclusions and limitations listed in clauses 22.2, 22.3, 23.3 and 23.4 in conjunction with 23.5, 24 as well as 26 ADSp do not apply when the damage has been caused by:

 

27.1.1

intent or gross negligence of the Freight Forwarder or vicarious agents or

 

27.1.2

infringement of Material Contractual Obligations, whereby such claims are limited to predictable and typical damages.

 

27.2

Divergent from clause 27.1.2 ADSp, the liability limitations of clause 24.1 and 24.2 ADSp only apply in case of gross negligent or intentional infringements of material contractual duties.

 

27.3

Sections 435, 507 HGB remains applicable within their scope of application.

 

27.4

Clause 27.1 ADSp is not applicable on statutory provisions, such as Article 25 MC, Article 36 CIM or Article 20, 21 CMNI, which extend Freight Forwarder’s liability, allows extending or expanding the imputation of fault of servants or third parties.

 

28. Liability insurance of the Freight Forwarder

 

28.1

The Freight Forwarder is obliged to purchase and maintain liability insurance at the usual market conditions with an insurer of his choice that, as a minimum, covers the ordinary liability amounts of its freight forwarding liability according to ADSp and statutory provisions. The agreement of maximum insurance amounts per Damage Case, Damage Event and year is permitted as well as the agreement of reasonable

deductibles for the Freight Forwarder.

 

28.2

Upon request, the Freight Forwarder is obliged to provide evidence of the liability insurance and its validity by presentation of an insurance confirmation within a reasonable Time Frame. In absence of such a presentation, the Principal is entitled to terminate the Freight Forwarding Contract extraordinarily.

 

28.3

The Freight Forwarder is only entitled to rely on the liability limitations of the ADSp, when the Freight Forwarder provides an appropriate insurance cover at the time of order.

 

 

29. Liability of the Principal

 

29.1

The liability of the Principal pursuant to sections 414, 455, 468, and 488 HGB is limited to EUR 200,000 per Damage Event.

 

29.2

The aforementioned liability limitation does not apply in case of personal injuries, such as injury of life, body and health, if the damage was caused by grossnegligence or wilful intent of the Principal or its vicarious agents, or infringement of Material Contractual Obligations, whereas the latter is limited to predictable and typical damages.

 

 

30. Applicable law , place of fulfilment, place of jurisdiction

 

30.1

The legal relationship between the Freight Forwarder and Principal is governed by German law.

 

30.2

The place of fulfilment for all involved parties is the location of the Freight Forwarder’s branch office dealing with the order or the enquiry.

 

30.3

The place of jurisdiction for all disputes and all involved parties arising from the Freight Forwarding Contract, an enquiry or in relation to it, is the location of the Principal or Freight Forwarder’s branch office dealing with the order or enquiry, as far as all these parties are merchants. The aforementioned place of jurisdiction shall be deemed as an additional place of jurisdiction pursuant to Article 31 CMR and Article 46 § 1 CIM, but not in case of Article 39 CMR, Article 33 MC, Article 28 Convention for the Unification of certain rules relating to international carriage by air (WC).

 

 

31. Confidentiality

 

31.1

Contractual parties are obliged to maintain confidentiality regarding all unpublished information received during the execution of the freight forwarding contract. This information can only be used for the exclusive purpose of contract fulfilment. The parties shall commit other legal persons with an equivalent confidentiality obligation, if these legal persons are deployed for contract fulfilment.

 

 

32. Compliance

 

32.1

The Freight Forwarder shall comply with minimum wage provisions and minimum conditions for workplaces and confirms the compliance in text form upon request of the Principal. The Freight Forwarder indemnifies the Principal for its liability

for minimum wages, if the Freight Forwarder, its subcontractor or hirer during the course of fulfilment of the Freight Forwarding Contract, does not pay the minimum wages and the Principal is demanded to pay.

 

32.2

The Freight Forwarder shall ensure in case of transportation services, that its executing subcontractor

 

32.2.1

possesses, within the scope of application of the Güterkraftverkehrsgesetz (GüKG), a permission according to section 3 GüKG, an entitlement according to section 6 GüKG or a community license or does not use such a permission, entitlement or license unlawfully.

 

32.2.2

deploys driving personnel, which comply with the requirements of section 7b (1) sentence 1 GüKG, if applicable,

 

32.2.3

upon request provides all documents, which must be carried during transportation according to statutory provisions, when the Principal or third parties must comply with statutory controlling obligations,

 

32.3

In case of transportation, the Freight Forwarder or its executing subcontractor is obliged to organise the activities of its driving personnel according to the compulsory working, driving and recreation times. During the driving of Vehicles, alcohol and drugs are generally prohibited.

 

32.4

Both contracting parties commit to carrying out their contractual duties and to act according to the legal regulations covering their business and to support and obey the principles of the United Nations Global Compact (UNGC), the United Nations Declaration of Human Rights, and the Declaration of the International Labour Organization regarding the 1998 Declaration on Fundamental Principles and Rights

at Work, in accordance with national laws and customs. In particular, both parties will commit to:

 

32.4.1

no child or forced labour,

 

32.4.2

comply with the relevant national laws and regulations regarding working hours, wages, salaries and to comply with any other obligations for employers,

 

32.4.3

to comply with the current regulations on health and safety at work, and to provide a safe and healthy workplace to ensure the health of employees and to avoid accidents, injuries and work-related illness,

 

32.4.4

prohibit all discrimination based on race, religion, disability, age, sexual orientation or sex,

 

32.4.5

comply with international standards on corruption, such as those published in UNGC and to adhere to local anticorruption and bribery laws,

 

32.4.6

adhere to all current environmental protection laws and regulations,

 

32.4.7

engage its business partners and subcontractors according to the aforementioned principles.

 



TOP

 

PEGA Logistics (Netherlands) B.V.

 

DUTCH FORWARDING CONDITIONS

GENERAL CONDITIONS OF THE FENEX (Netherlands Association for Forwarding and Logistics)

 

Applicability

 

Article 1.

 

1. These general conditions shall apply to any form of service which the forwarder shall perform. Within the framework of these general conditions the term forwarder must not be understood exclusively to mean the forwarder as contemplated in Book 8 of the Dutch Civil Code. The party ordering the forwarder to carry out operations and activities shall be considered the forwarder's principal, regardless of the agreed mode of payment.

 

2. With respect to the operations and activities, such as those of shipbrokers, stevedores, carriers, insurance agents, warehousing and superintending firms etc. which are carried out by the forwarder, the conditions customary in the particular trade, or conditions stipulated to be applicable, shall also be applicable.

 

3. The forwarder may at any time declare applicable provisions from the conditions stipulated by third parties with whom he has made contracts for the purpose of carrying out the orders given to him.

 

4. The forwarder may have his orders and/or the work connected therewith carried out by third parties or the servants of third parties. In so far as such third parties or their servants bear statutory liability towards the forwarder's principal, it is stipulated on their behalf that in doing the work for which the forwarder employs them they shall be regarded as solely in the employ of the forwarders. All the provisions (inter alia) regarding non-liability and limitation of liability and also regarding indemnification of the forwarder as described herein shall apply to such persons.

 

5. Instructions for delivery C.O.D., against banker's draft etc., shall be deemed to be forwarding work.

 

Contracts

 

Article 2.

 

1. All quotations made by the forwarder shall be without any obligation on his part.

 

2. All prices quoted and agreed shall be based on the rates, wages, costs incidental to social security and/or other provisions of law, freight and exchange rates applying at the time of quotation or contract.

 

3. Upon any change in any or more of these factors the quoted or agreed prices shall likewise be altered in accordance therewith and retroactively to the time such change occurred.

 

The forwarder must be able to prove the change(s).

 

Article 3.

 

1. If the forwarder charges all-in or fixed rates, as the case may be, these rates shall be deemed to include all costs that in the normal procedure of handling the order are for the account of the forwarder.

 

2. Unless provided otherwise, all-in or fixed rates shall not include at any rate: duties, taxes and levies, consular and attestation fees, cost of preparing bank guarantees and insurance premiums.

 

3. For work of a special nature, unusual job or work requiring a special amount of time or effort, an additional reasonable amount may at all times be charged.

 

Article 4.

 

1. In the event of loading and/or unloading time being inadequate - regardless of the cause thereof - all costs resulting therefrom, such as demurrage, etc., shall be borne by the principal, even when the forwarder has accepted the bill of lading and/or charter party from which the additional costs arise without protestation.

 

2. Expenses of an exceptional nature and higher wages arising whenever carriers by virtue of any provision in the shipping documents load or unload goods in the evening, at night, on Saturdays or on Sundays or public holidays, shall not be included in the agreed prices, unless specifically stipulated. Any such costs shall therefore be refunded by the principal to the forwarder.

 

Article 5.

 

1. Insurance of any kind shall be arranged only upon specific instructions in writing at the principal's expense and risk. The risks to be covered shall be clearly stated. A mere statement of the value is not enough.

 

2. If the forwarder has taken out any insurance in his own name he shall be bound - if so requested - only to transfer his claims against the insurer to his principal.

 

3. The forwarder shall not be responsible as regards the choice of the insurer and the latter's solvency.

 

4. When the forwarder uses derricks and any other such equipment for carrying out his orders he shall be entitled to take out insurance at his principal's expense to cover the forwarder's risk arising through the use of such equipment.

 

Article 6.

 

1. Unless agreed otherwise in writing, the supplying to the forwarder of data required for customs formalities shall imply an order to perform such formalities.

 

Performance of the contract

 

Article 7.

 

1. If the principal has not given any specific instructions with his order, the mode and route of transport shall be at the forwarder's option and the forwarder may at all times accept the documents customarily used by the firms with which he contracts for the purpose of carrying out his orders.

 

Article 8.

 

1. The principal shall ensure that the goods are tendered at the agreed place and time.

 

2. The principal shall ensure that the documents required for receipt and for despatch, as well as the instructions, are in the forwarder's possession in proper time.

 

3. The forwarder shall not be obliged but shall be entitled to investigate whether the specifications stated to him are correct and complete.

 

4. In the absence of documents, the forwarder shall not be obliged to receive against a guarantee. Should the forwarder furnish a guarantee, he shall be saved harmless by his principal from and against all the consequences thereof.

 

Article 9.

 

1. All operations such as inspecting, sampling, taring, tallying, weighing, measuring etc., and receiving goods subject to appraisal by a court-appointed expert shall take place only on the principal's specific instructions and upon reimbursement of the costs thereof.

 

2. Nevertheless, the forwarder shall be entitled, but not obliged, on his own authority and at his principal's expense and risk to take all such action as he deems necessary in the principal's interest.

 

3. The forwarder shall not act as an expert. He shall in no way be liable for any notification of the state, nature or quality of the goods; nor shall he be under any obligation to ensure that the shipped goods correspond with the samples.

 

Article 10.

 

1. The addition of the word "approximately" shall allow the principal the freedom to supply 2.5% more or less.

 

Liability

 

Article 11.

 

1. All operations and activities shall be at the principal's expense and risk.

 

2. Without prejudice to the provisions of Article 16, the forwarder shall not be liable for any damage whatsoever, unless the principal shall prove that the damage has been caused by fault or negligence on the part of the forwarder or the latter's servants.

 

3. The forwarder's liability shall in all cases be limited to 10,000 SDR per occurrence or series of occurrences with one and the same cause of damage, on the understanding that in the event of damaging, loss of value or loss of the goods comprised in the order, the liability shall be limited to 4 SDR per kilogram damaged or lost gross weight, the maximum being 4,000 SDR per consignment.

 

4. The loss to be indemnified by the forwarder shall never exceed the invoice value of the goods, to be proved by the principal, in default whereof the market value - to be proved by the principal - at the time when the damage has occurred shall apply. The forwarder shall not be liable for lost profit, consequential loss, and pain and suffering.

 

5. If during the execution of the order damage occurs for which the forwarder is not liable, the forwarder shall make efforts to recover the principal's damage from the party that is liable for the damage.

 

The forwarder shall be entitled to charge to the principal the costs incidental thereto. If so requested, the forwarder shall waive in his principal's favour his claims against third parties engaged by him for the purpose of carrying out the order.

 

6. The principal shall be liable towards the forwarder for any damage as a consequence of the (nature of the) goods and the packaging thereof, the incorrectness, inaccuracy or incompleteness of instructions and data, the failure to tender the goods or not doing so in time at the agreed place and time, as well as the failure to supply -- or to do so in time -- documents and/or instructions, and fault or negligence in general on the part of the principal and the latter's servants and third parties called in or engaged by him.

 

7. The principal shall indemnify the forwarder against third-party claims connected with the damage referred to in the foregoing paragraph, such third parties including servants of both the forwarder and the principal.

 

8. Even where all-in or fixed rates, as the case may be, have been agreed, the forwarder, who is not a carrier, shall be liable under the present conditions and not as a carrier.

 

Article 12.

 

1. To be regarded as force majeure are all circumstances which the forwarder could not reasonably avoid and the consequences of which the forwarder could not reasonably prevent.

 

Article 13.

 

1. In the event of force majeure, the contract shall remain in force; the forwarder's obligations shall, however, be suspended for the duration of the event of force majeure.

 

2. All additional costs caused by force majeure, such as carriage and storage charges, warehouse or yard rentals, demurrage for vessels or trucks, insurance, removal, etc., shall be borne by the principal and shall be paid to the forwarder at the forwarder’s initial request.

 

Article 14.

 

1. The mere statement by the principal of a time for delivery shall not be binding upon the forwarder.

 

2. The forwarder does not guarantee arrival times, unless agreed otherwise in writing.

 

Article 15.

 

1. If the carriers refuse to sign for number or weight of pieces or items etc., the forwarder shall not be liable for the consequences thereof.

 

Imperative law

 

Article 16.

 

1. If the goods are not delivered without delay at the place of destination in the state in which they were tendered, the forwarder, in so far as he has carried out a contract of transport himself which he was to conclude with a third party, is obliged to notify this forthwith to the principal who has notified him of the damage.

 

2. If the forwarder fails to make notification as referred to in the first paragraph and if as a result thereof he has not been called upon as a carrier in time, he shall, in addition to being liable for payment of the further damage sustained by the principal as a result thereof, be liable to pay compensation equal to the damages he would have had to pay, if he had been called upon as a carrier in time.

 

3. If the goods are not delivered without delay at the place of destination in the state in which they were tendered, the forwarder, in so far as he has not carried out a contract of transport himself which he was to conclude with a third party, is obliged to inform the principal forthwith which contracts of transport he has entered into to fulfil his obligation. He is also obliged to put at the disposal of the principal all documents in his possession or which he can reasonably supply, at any rate in so far as they may be used to claim damages sustained.

 

4. As from the point of time at which he informs the forwarder unequivocally that he wishes to exercise such rights and powers, the principal shall obtain as against the party with whom the forwarder has conducted business the rights and powers to which he would have been entitled if as a shipper he had concluded the contract himself. He shall be free to take legal action in this matter if he submits a statement to be issued by the forwarder - or in case the forwarder has gone into compulsory liquidation, by the forwarder's liquidator - that between him and the forwarder with respect to the goods a contract for the carriage thereof was concluded.

 

5. If the forwarder fails to comply with an obligation as referred to in the third paragraph, he shall, in addition to being liable for payment of the further damage sustained by the principal as a result thereof, be liable to pay compensation equal to the damages which the principal would have received from him if he himself had carried out the contract concluded by him, less the damages which the principal may have received from the carrier.

 

Payment

 

Article 17.

 

1. The principal shall pay to the forwarder the agreed remuneration and other resulting costs, freights, duties, etc., ensuing from the contract and/or these conditions, upon arrival or despatch of goods which are being received or forwarded respectively. The risk of exchange rate fluctuations shall be borne by the principal.

 

The agreed remuneration and other resulting costs, freights, rights, etc., ensuing from the contract and/or these conditions, shall also be due if in the performance of the contract damage has occurred.

 

2. If, in contravention of paragraph 1 of this article, the forwarder allows deferred payment, the forwarder shall be entitled to make an additional credit limit charge.

 

3. If the principal does not pay the amount due immediately upon notice to that effect or, as the case may be, after lapse of the term of deferred payment, the forwarder shall be entitled to charge the legal interest in conformity with Articles 6:119 or 6:119a Dutch Civil Code.

 

4. In the event of cancellation or dissolution of the contract, all claims of the forwarder, with the inclusion of future claims, shall become due and payable forthwith and in full. All claims shall be due and payable forthwith and in full in any case, if:

 

- the principal is involuntarily wound up, the principal applies for suspension of payment or otherwise loses the unrestricted disposition over his assets;

 - the principal offers a settlement to his creditors, is in default of fulfilling any financial obligation owed to the forwarder, ceases to trade or - where the principal is a legal entity or a corporate body - if the legal entity or the corporate body is dissolved.

 

5. The principal shall be reason of the forwarding contract and upon demand by the forwarder provide security in the form of a bond with sureties for any amount for which the principal is or may be indebted to the forwarder. The principal is also so obliged where he already has to provide or has provided security in the form of a bond with sureties in connection with the amount owed.

 

6. The forwarder shall not be obliged out of his own means to provide security in the form of a bond with sureties for the payment of freight, duties, levies, taxes and/or other costs should the same be demanded. All the consequences of non-compliance or of failure to comply forthwith with a demand to provide security in the form of a bond with sureties shall be borne by the principal.

 

If the forwarder has provided security in the form of a bond with sureties out of his own means, he may demand that the principal pay the amount for which security has been provided security in the form of a bond with sureties.

 

7. The principal shall at all times be obliged to indemnify the forwarder for any amounts to be levied or additionally demanded by any authority in connection with the order, as well as any related fines imposed upon the forwarder.

 

The principal shall also reimburse the said amounts to the forwarder if a third party called in by the forwarder demands payment within the framework of the forwarding contract.

 

8. The principal shall at all times indemnify the forwarder for any amounts as well as for all additional costs that may be claimed or additionally claimed from the forwarder in connection with the order as a result of incorrectly charged freight rates and costs.

 

9. The principal shall not be entitled to apply any set-off in respect of sums charged by the forwarder to the principal under any contract existing between them.

 

Article 18.

 

1. Cash payments shall be deemed in the first place to have been made on account of non-preferential debts, regardless of whether any other instructions were given at the time of payment.

 

2. If legal proceedings or other means are resorted to in the event of overdue payment, the amount of the indebtedness shall be increased by 10% for clerical expenses, while the legal and other costs shall be borne by the principal up to the amount paid by or due from the forwarder.

 

Article 19.

 

1. With respect to all claims he has or may at any time have against the principal and/or the owner, the forwarder shall have a pledge and a lien on all goods, documents and moneys which he holds or will hold in his possession whatever the reason and the purpose thereof may be, as against any party requiring their delivery. If the goods are forwarded on, the forwarder shall be entitled to collect the sum due on subsequent delivery or draw a bill therefor with the shipping documents annexed.

 

2. The forwarder may also exercise the rights granted to him in paragraph 1 for that which the principal was owing to him with respect to previous orders.

 

3. The forwarder is also authorized to exercise the rights granted to him by virtue of paragraph 1 for any amount(s) payable by way of delivery C.O.D. in respect of the goods.

 

4. Failing payment of the amount due the security shall be sold as provided by statute or - if so agreed - by private sale.

 

Final provisions

 

Article 20.

 

1. No legal or arbitration proceedings shall be taken against third parties by the forwarder unless he states his readiness to take the same at the principal's request and expense.

 

Article 21.

 

1. Without prejudice to the provisions of paragraph 5 of this Article, all claims shall be barred by the mere lapse of a period of nine months.

 

2. All claims against the forwarder shall be barred by the mere lapse of a period of eighteen months.

 

3. The terms mentioned in paragraphs 1 and 2 shall commence on the day following the day on which the claim has become due and payable or the day following the day on which the prejudiced party had knowledge of the loss. Without prejudice to the preceding provisions, the said terms shall commence on the day following the day of delivery with respect to claims regarding damage to, decrease in value or loss of the goods. The day of delivery shall be understood to be the day on which the goods are delivered from the means of transport or, if they have not been delivered, the day on which they should have been delivered.

 

4. In case any public authority or third parties as referred to in paragraph 7 of Article 17 claim payment from the forwarder, the term mentioned in paragraph 1 of this Article shall commence on the first of the following days:

 

● the day following the day on which payment is claimed from the forwarder by any public authority or third party;

● the day following the day on which the forwarder has settled the claim existing against him.

 

If the forwarder or a third party called in by the forwarder as referred to in Article 17, par. 7 has submitted an administrative objection and/or lodged an administrative appeal, the period specified in paragraph 1 shall commence on the day following the day on which the decision on the administrative objection and/or the administrative appeal has become final.

 

5. If after the term of prescription a third party claims payment of the amount due and payable by either parties, a new term of prescription - of three months - commences, unless the situation referred to in paragraph 4 of this Article occurs.

 

Article 22.

 

1. All contracts to which the present conditions apply shall be governed by Dutch law.

 

2. The place for settlement and adjustment of damage shall be that where the forwarder's business is situated.

 

Disputes

 

Article 23.

 

1. All disputes which may arise between the forwarder and the other party shall be decided by three arbitrators to the exclusion of the ordinary courts of law, and their decision shall be final. A dispute shall exist whenever any of the parties declares this to be so.

 

Without prejudice to the provisions of the preceding paragraph the forwarder shall be at liberty to bring before the competent Dutch court in the forwarder’s place of business claims for sums of money due [and] payable, the indebtedness of which has not been disputed in writing by the opposing party within four weeks after the invoice date. In the event of urgent claims, the forwarder shall equally be at liberty to institute interim relief proceedings (kort geding) before the competent Dutch court in the forwarder’s place of business.

 

2. One arbitrator shall be appointed by the Chairman or the Vice-Chairman of the FENEX; the second shall be appointed by the Dean of the Bar Association of the district in which the aforesaid forwarder has registered office; the third shall be appointed by mutual agreement between the two arbitrators so appointed.

 

3. The Chairman of the FENEX shall appoint as such an expert on forwarding questions; the Dean of the Bar Association shall be asked to appoint a member of the legal profession; the third arbitrator shall preferably be an expert on the trade and industry in which the forwarder's opposite party is engaged.

 

4. The party desirous of having the dispute determined shall inform the Secretariat of the FENEX hereof by registered letter or fax letter, giving a brief description of the dispute and of his claim and at the same time remitting the amount of administrative costs to be determined by the Board of the FENEX, due as a compensation for the administrative work of the FENEX in an arbitration case.

 

A case shall be considered to be pending on the day of receipt of the said registered letter or fax letter by the Secretariat of the FENEX.

 

5. After receipt of the above-mentioned application for arbitration the Secretariat of the FENEX shall as soon as possible acknowledge receipt thereof and send a copy of the application to the other party, to the Chairman of the FENEX, to the Dean of the Bar Association, with a request to each of the latter two to appoint an arbitrator and to notify the FENEX Secretariat of the name and address of the person appointed.

 

Upon receipt of such notification the FENEX Secretariat shall as soon as possible notify the persons concerned of their appointment, send each of them a copy of the application for arbitration and a copy of these general conditions and request each of them to appoint a third arbitrator and notify the FENEX Secretariat of the person so appointed.

 

Upon receipt hereof the FENEX Secretariat shall forthwith notify the third arbitrator of his appointment, at the same time sending him a copy of the application for arbitration and a copy of these general conditions. The FENEX Secretariat shall also notify both parties as to who have been appointed arbitrators.

 

6. If all three arbitrators have not been appointed within two months of the application for arbitration having being lodged all of them shall be appointed by the President of the District Court within whose jurisdiction the forwarder's business is situated upon the application of whichever party shall first make the same.

 

7. The person appointed by the Dean shall act as Chairman of the arbitration board. If the arbitrators are appointed by the President of the District Court, the arbitrators shall themselves decide who is to function as chairman. The place of arbitration shall be the place where the chairman of the arbitrators is established.

 

The arbitrators shall make their award as good men in equity, subject to their liability to observe the applicable imperative legal stipulations. Where applicable, they shall also apply the provisions of the international transport treaties, among which, inter alia, the Convention on the Contract for the International Carriage of Goods by Road (CMR).

 

The arbitrators shall determine the procedure of the arbitration, subject to the parties being given opportunity to put forward their cases in writing and to elucidate the same orally. © Copyright FENEX, 2004 10-10 All rights reserved. These conditions, or parts thereof, may not be reproduced, copied or published in any form or by any means without the written permission of FENEX, The Netherlands.

 

8. The arbitrators shall continue in office until the final award. They shall deposit their award at the Registry of the District Court within the district of which the seat of the arbitration is situated, while a copy thereof shall be sent to each of the parties and to the FENEX Secretariat.

 

The arbitrators may require the Plaintiff or both parties to deposit a sum beforehand in respect of the arbitration costs; during the proceedings they may require an additional amount to be deposited. If, within three weeks of the relevant request, the deposit required by the arbitrators of the plaintiff has not been paid in, it shall be deemed to have withdrawn the arbitration. In their award the arbitrators shall order which of the two parties shall bear the costs of arbitration or what proportion thereof each party shall bear. These costs shall comprise the arbitrators' fees and disbursements, the amount of administrative costs paid to the FENEX with the application and the costs incurred by the parties in so far as the arbitrators deem the same to be reasonably necessary.

 

The sums due to the arbitrators shall to the extent possible be taken from the amounts deposited.

 

Article 24.

 

1. These general conditions may be cited as the "Dutch Forwarding Conditions".

 

In case the English translation differs from the Dutch text, the latter will prevail.

 

TOP